Aquilla Lake 2 Wind: curtailment and node price
A 151 MW wind farm in Hill & Limestone County, Texas (North), in service 2023. It settles at resource node AQUI_ALL in LZ_NORTH.
By year
| Period | Potential GWh | Curtailed GWh | Curtailed | Node $/MWh | Load zone $/MWh | Node while curtailed | Hours ≤ $0 |
|---|---|---|---|---|---|---|---|
| 2024 (from Jan 24) | 464 | 1.0 | 0.2% | $25.05 | $26.41 | −$32.43 | 4% |
| 2025 | 493 | 16.5 | 3.3% | $26.02 | $32.66 | −$38.70 | 13% |
| 2026 to date | 324 | 7.2 | 2.2% | $26.63 | $33.93 | −$42.33 | 14% |
| Last 12 months | 455 | 15.8 | 3.5% | $25.15 | $33.64 | −$40.18 | 15% |
Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.
The full picture
A LoadSettle asset report on Aquilla Lake 2 Wind adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.
Request a report on Aquilla Lake 2 Wind
The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.