All ERCOT wind and solar plants · Curtailment map and ranking

Aquilla Lake 2 Wind: curtailment and node price

A 151 MW wind farm in Hill & Limestone County, Texas (North), in service 2023. It settles at resource node AQUI_ALL in LZ_NORTH.

3%of its potential output curtailed in the last 12 months (15.8 GWh). #145 of 494 ERCOT wind and solar plants by curtailed energy.
$25.15average real-time price at its node, per MWh, against $33.64 in its load zone, a $8.49 discount
−$40.18average node price while it was curtailed, weighted by the curtailed energy
15%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)4641.00.2%$25.05$26.41−$32.434%
202549316.53.3%$26.02$32.66−$38.7013%
2026 to date3247.22.2%$26.63$33.93−$42.3314%
Last 12 months45515.83.5%$25.15$33.64−$40.1815%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

The full picture

A LoadSettle asset report on Aquilla Lake 2 Wind adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Aquilla Lake 2 Wind

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.