Barrow Ranch (Jumbo Hill Wind) 2: curtailment and node price
A 71 MW wind farm in Andrews County, Texas (West), in service 2021. It settles at resource node BARROW_ALL in LZ_WEST.
By year
| Period | Potential GWh | Curtailed GWh | Curtailed | Node $/MWh | Load zone $/MWh | Node while curtailed | Hours ≤ $0 |
|---|---|---|---|---|---|---|---|
| 2024 (from Jan 24) | 234 | 0.3 | 0.1% | $37.14 | $35.71 | −$28.21 | 8% |
| 2025 | 257 | 0.0 | 0.0% | $44.53 | $42.18 | $21.08 | 5% |
| 2026 to date | 190 | 0.0 | 0.0% | $33.18 | $32.33 | $33.41 | 13% |
| Last 12 months | 263 | 0.0 | 0.0% | $37.39 | $35.34 | $20.35 | 10% |
Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.
What's coming in Andrews County
ERCOT's interconnection queue (October 2026 report) lists 8 projects in Andrews County, 2,012 MW in all: 252 MW solar, 1,118 MW batteries, 642 MW wind. None of it has a signed interconnection agreement yet. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.
The full picture
A LoadSettle asset report on Barrow Ranch (Jumbo Hill Wind) 2 adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.