All ERCOT wind and solar plants · Curtailment map and ranking
Blue Summit Wind 1 B: curtailment and node price
A 7 MW wind farm in Wilbarger County, Texas (West), in service 2013. It settles at resource node BLSMT1_5_A_6 in LZ_WEST.
By year
| Period | Potential GWh | Curtailed GWh | Curtailed | Node $/MWh | Load zone $/MWh | Node while curtailed | Hours ≤ $0 |
|---|---|---|---|---|---|---|---|
| 2024 (from Jan 24) | 25.7 | 0.0 | 0.0% | $22.39 | $35.71 | −$25.37 | 13% |
| 2025 | 26.7 | 0.0 | 0.0% | $26.93 | $42.18 | $11.56 | 12% |
| 2026 to date | 21.5 | 0.0 | 0.0% | $26.64 | $32.33 | — | 16% |
| Last 12 months | 29.0 | 0.0 | 0.0% | $26.65 | $35.34 | −$36.04 | 15% |
Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.
What's coming in Wilbarger County
ERCOT's interconnection queue (October 2026 report) lists 21 projects in Wilbarger County, 8,451 MW in all: 2,262 MW solar, 835 MW batteries, 146 MW wind, 5,208 MW gas. 3,521 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.
The full picture
A LoadSettle asset report on Blue Summit Wind 1 B adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.