All ERCOT wind and solar plants · Curtailment map and ranking

Bnb Lamesa Solar (Phase I): curtailment and node price

A 102 MW solar plant in Dawson County, Texas (West), in service 2018. It settles at resource node LAMESASLR_G in LZ_WEST.

24%of its potential output curtailed in the last 12 months (58.1 GWh). #74 of 494 ERCOT wind and solar plants by curtailed energy.
$37.12average real-time price at its node, per MWh, against $35.34 in its load zone, a $1.78 premium
−$3.95average node price while it was curtailed, weighted by the curtailed energy
11%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)23243.118.6%$29.38$35.71−$20.9412%
202524622.99.3%$49.93$42.18−$1.294%
2026 to date18550.327.1%$32.20$32.33−$4.1314%
Last 12 months24358.123.9%$37.12$35.34−$3.9511%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Dawson County

ERCOT's interconnection queue (October 2026 report) lists 8 projects in Dawson County, 1,611 MW in all: 662 MW solar, 100 MW batteries, 849 MW wind. 713 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Bnb Lamesa Solar (Phase I) adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Bnb Lamesa Solar (Phase I)

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.