All ERCOT wind and solar plants · Curtailment map and ranking

Cameron County Wind: curtailment and node price

A 165 MW wind farm in Cameron County, Texas (Coastal), in service 2016. It settles at resource node CAMWIND_RN in LZ_SOUTH.

15%of its potential output curtailed in the last 12 months (49.8 GWh). #79 of 494 ERCOT wind and solar plants by curtailed energy.
$28.71average real-time price at its node, per MWh, against $33.12 in its load zone, a $4.41 discount
−$10.06average node price while it was curtailed, weighted by the curtailed energy
11%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)33731.39.3%$19.99$30.43−$34.1719%
20253568.12.3%$23.03$33.50−$24.0616%
2026 to date26146.017.6%$28.43$31.93−$9.4412%
Last 12 months33049.815.1%$28.71$33.12−$10.0611%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Cameron County

ERCOT's interconnection queue (October 2026 report) lists 28 projects in Cameron County, 8,537 MW in all: 908 MW solar, 2,741 MW batteries, 300 MW wind, 4,508 MW gas, 80 MW other. 746 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Cameron County Wind adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Cameron County Wind