All ERCOT wind and solar plants · Curtailment map and ranking

Compadre Solar: curtailment and node price

A 608 MW solar plant in Hill County, Texas (North), in service 2026. It settles at resource node CMPD_SLR_RN in LZ_NORTH. Owner (public sources): TotalEnergies.

20%of its potential output curtailed in the last 12 months (195 GWh). #5 of 494 ERCOT wind and solar plants by curtailed energy.
$25.90average real-time price at its node, per MWh, against $33.64 in its load zone, a $7.74 discount
−$35.45average node price while it was curtailed, weighted by the curtailed energy
14%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)4.00.25.1%$26.29$27.29$15.921%
202580014017.5%$25.77$32.66−$35.1413%
2026 to date75311314.9%$27.54$33.93−$32.4512%
Last 12 months97719519.9%$25.90$33.64−$35.4514%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Hill County

ERCOT's interconnection queue (October 2026 report) lists 22 projects in Hill County, 7,784 MW in all: 1,449 MW solar, 1,951 MW batteries, 331 MW wind, 4,053 MW gas. 2,315 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Compadre Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Compadre Solar

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.