All ERCOT wind and solar plants · Curtailment map and ranking

Coral Solar: curtailment and node price

A 154 MW solar plant in Falls County, Texas (North), in service 2024. It settles at resource node CORALSLR_ALL in LZ_NORTH.

10%of its potential output curtailed in the last 12 months (31.0 GWh). #102 of 494 ERCOT wind and solar plants by curtailed energy.
$31.55average real-time price at its node, per MWh, against $33.64 in its load zone, a $2.09 discount
−$5.31average node price while it was curtailed, weighted by the curtailed energy
5%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)23511.24.7%$24.94$26.41−$19.904%
202532724.47.5%$31.03$32.66−$5.674%
2026 to date22127.212.3%$31.53$33.93−$5.636%
Last 12 months29731.010.5%$31.55$33.64−$5.315%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Falls County

ERCOT's interconnection queue (October 2026 report) lists 7 projects in Falls County, 612 MW in all: 552 MW solar, 60 MW batteries. None of it has a signed interconnection agreement yet. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Coral Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Coral Solar

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.