A 218 MW solar plant in Jones County, Texas (West), in service 2026. It settles at resource node CST1_SLR_RN in LZ_WEST.

0%of its potential output curtailed in the last 12 months (0.0 GWh). #446 of 494 ERCOT wind and solar plants by curtailed energy.
$26.89average real-time price at its node, per MWh, against $32.59 in its load zone, a $5.70 discount
$17.79average node price while it was curtailed, weighted by the curtailed energy
16%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2026 to date46.50.00.1%$26.89$32.59$17.7916%
Last 12 months46.50.00.1%$26.89$32.59$17.7916%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Jones County

ERCOT's interconnection queue (October 2026 report) lists 18 projects in Jones County, 4,420 MW in all: 3,038 MW solar, 1,382 MW batteries. 1,773 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Crowded Star Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Crowded Star Solar

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.