Delilah Solar 1: curtailment and node price

A 307 MW solar plant in Lamar County, Texas (North), in service 2026. It settles at resource node TTRSW_RN in LZ_NORTH.

0%of its potential output curtailed in the last 12 months (0.0 GWh). #441 of 494 ERCOT wind and solar plants by curtailed energy.
$33.91average real-time price at its node, per MWh, against $33.64 in its load zone, a $0.27 premium
$22.38average node price while it was curtailed, weighted by the curtailed energy
3%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)1842.81.5%$26.28$26.41$1.302%
20255641.30.2%$31.64$32.66$23.734%
2026 to date3430.00.0%$34.27$33.93$5.723%
Last 12 months4800.00.0%$33.91$33.64$22.383%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Lamar County

ERCOT's interconnection queue (October 2026 report) lists 25 projects in Lamar County, 6,190 MW in all: 3,165 MW solar, 851 MW batteries, 397 MW wind, 545 MW gas, 1,232 MW other. 3,502 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Delilah Solar 1 adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Delilah Solar 1

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.