Dileo Solar: curtailment and node price

A 71 MW solar plant in Bosque County, Texas (North), in service 2023. It settles at resource node DILEOS_UNIT1 in LZ_NORTH.

2%of its potential output curtailed in the last 12 months (3.3 GWh). #259 of 494 ERCOT wind and solar plants by curtailed energy.
$32.97average real-time price at its node, per MWh, against $33.64 in its load zone, a $0.67 discount
−$19.01average node price while it was curtailed, weighted by the curtailed energy
5%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)1450.10.1%$26.35$26.41−$65.634%
20251550.80.5%$32.58$32.66−$13.044%
2026 to date1212.82.3%$32.66$33.93−$21.075%
Last 12 months1593.32.1%$32.97$33.64−$19.015%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Bosque County

ERCOT's interconnection queue (October 2026 report) lists 3 projects in Bosque County, 383 MW in all: 175 MW solar, 208 MW batteries. None of it has a signed interconnection agreement yet. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Dileo Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Dileo Solar

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.