All ERCOT wind and solar plants · Curtailment map and ranking
Emerald Grove Solar (Pecos Solar Power I): curtailment and node price
A 110 MW solar plant in Crane County, Texas (West), in service 2023. It settles at resource node HORSCR_RN in LZ_WEST.
By year
| Period | Potential GWh | Curtailed GWh | Curtailed | Node $/MWh | Load zone $/MWh | Node while curtailed | Hours ≤ $0 |
|---|---|---|---|---|---|---|---|
| 2024 (from Jan 24) | 265 | 0.8 | 0.3% | $37.28 | $35.71 | $6.85 | 9% |
| 2025 | 258 | 0.0 | 0.0% | $45.79 | $42.18 | −$4.28 | 7% |
| 2026 to date | 165 | 0.5 | 0.3% | $33.36 | $32.33 | −$25.81 | 13% |
| Last 12 months | 227 | 0.5 | 0.2% | $37.01 | $35.34 | −$25.62 | 11% |
Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.
What's coming in Crane County
ERCOT's interconnection queue (October 2026 report) lists 12 projects in Crane County, 2,740 MW in all: 1,370 MW solar, 1,370 MW batteries. 1,121 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.
The full picture
A LoadSettle asset report on Emerald Grove Solar (Pecos Solar Power I) adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.
Request a report on Emerald Grove Solar (Pecos Solar Power I)
The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.