All ERCOT wind and solar plants · Curtailment map and ranking

Gunsight Mountain Wind: curtailment and node price

A 120 MW wind farm in Howard County, Texas (West), in service 2016. It settles at resource node GUNMTN_NODE in LZ_WEST.

2%of its potential output curtailed in the last 12 months (7.5 GWh). #211 of 494 ERCOT wind and solar plants by curtailed energy.
$37.51average real-time price at its node, per MWh, against $35.34 in its load zone, a $2.17 premium
−$1.78average node price while it was curtailed, weighted by the curtailed energy
11%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)4335.71.3%$32.67$35.71−$41.1913%
20254270.00.0%$55.04$42.18−$14.314%
2026 to date3337.52.2%$31.78$32.33−$1.7813%
Last 12 months4677.51.6%$37.51$35.34−$1.7811%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Howard County

ERCOT's interconnection queue (October 2026 report) lists 17 projects in Howard County, 2,767 MW in all: 402 MW solar, 2,111 MW batteries, 254 MW wind. 100 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Gunsight Mountain Wind adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Gunsight Mountain Wind

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.