Hart Wind 2: curtailment and node price

A 164 MW wind farm in Castro County, Texas (Panhandle), in service 2025. It settles at resource node HART_WND_RN in LZ_WEST.

0%of its potential output curtailed in the last 12 months (2.1 GWh). #274 of 494 ERCOT wind and solar plants by curtailed energy.
$23.68average real-time price at its node, per MWh, against $35.34 in its load zone, a $11.66 discount
−$61.89average node price while it was curtailed, weighted by the curtailed energy
24%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
20253502.00.6%$24.78$41.75−$61.6416%
2026 to date5920.20.0%$24.62$32.33−$42.7422%
Last 12 months8202.10.3%$23.68$35.34−$61.8924%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Castro County

ERCOT's interconnection queue (October 2026 report) lists 7 projects in Castro County, 2,304 MW in all: 1,110 MW solar, 553 MW batteries, 641 MW wind. 729 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Hart Wind 2 adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Hart Wind 2

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.