All ERCOT wind and solar plants · Curtailment map and ranking

Hhgt: curtailment and node price

A wind farm in Texas (Texas). It settles at resource node HHGT_KENDAL in LZ_SOUTH.

1%of its potential output curtailed in the last 12 months (5.0 GWh). #235 of 494 ERCOT wind and solar plants by curtailed energy.
$34.17average real-time price at its node, per MWh, against $33.12 in its load zone, a $1.05 premium
$11.45average node price while it was curtailed, weighted by the curtailed energy
3%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)4011.00.3%$27.81$30.43−$45.804%
20254383.00.7%$33.96$33.50−$21.504%
2026 to date3504.61.3%$32.57$31.93$15.053%
Last 12 months4835.01.0%$34.17$33.12$11.453%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

The full picture

A LoadSettle asset report on Hhgt adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Hhgt