All ERCOT wind and solar plants · Curtailment map and ranking

Hidalgo Ii Wind: curtailment and node price

A 50 MW wind farm in Hidalgo County, Texas (South), in service 2021. It settles at resource node MIRASOLE_GEN in LZ_SOUTH.

0%of its potential output curtailed in the last 12 months (0.0 GWh). #462 of 494 ERCOT wind and solar plants by curtailed energy.
$26.15average real-time price at its node, per MWh, against $33.12 in its load zone, a $6.97 discount
−$8.38average node price while it was curtailed, weighted by the curtailed energy
11%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)1405.74.1%$21.08$30.43−$36.6419%
20251670.70.4%$23.08$33.50−$35.6316%
2026 to date1370.00.0%$24.50$31.93−$4.0112%
Last 12 months1730.00.0%$26.15$33.12−$8.3811%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Hidalgo County

ERCOT's interconnection queue (October 2026 report) lists 25 projects in Hidalgo County, 3,677 MW in all: 724 MW solar, 2,470 MW batteries, 234 MW wind, 250 MW gas. 1,110 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Hidalgo Ii Wind adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Hidalgo Ii Wind

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.