All ERCOT wind and solar plants · Curtailment map and ranking

Horizon Solar: curtailment and node price

A 204 MW solar plant in Frio County, Texas (South), in service 2024. It settles at resource node HRZN_SLR_UN1 in LZ_SOUTH.

2%of its potential output curtailed in the last 12 months (7.8 GWh). #208 of 494 ERCOT wind and solar plants by curtailed energy.
$33.25average real-time price at its node, per MWh, against $33.12 in its load zone, a $0.13 premium
$2.14average node price while it was curtailed, weighted by the curtailed energy
5%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)43723.05.3%$29.81$30.43$22.125%
202548015.13.1%$33.32$33.50$1.608%
2026 to date3667.22.0%$31.58$31.93$2.796%
Last 12 months4837.81.6%$33.25$33.12$2.145%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Frio County

ERCOT's interconnection queue (October 2026 report) lists 4 projects in Frio County, 804 MW in all: 402 MW solar, 402 MW batteries. None of it has a signed interconnection agreement yet. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Horizon Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Horizon Solar

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.