Jade Solar: curtailment and node price

A 321 MW solar plant in Scurry County, Texas (West), in service 2024. It settles at resource node JADE_SLR_ALL in LZ_WEST. Owner (public sources): Intersect Power.

20%of its potential output curtailed in the last 12 months (165 GWh). #6 of 494 ERCOT wind and solar plants by curtailed energy.
$25.87average real-time price at its node, per MWh, against $35.34 in its load zone, a $9.47 discount
−$10.50average node price while it was curtailed, weighted by the curtailed energy
18%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)73254.67.5%$22.97$35.71−$4.6614%
202580812315.3%$25.30$42.18−$11.9116%
2026 to date64413621.1%$25.73$32.33−$10.4019%
Last 12 months83816519.7%$25.87$35.34−$10.5018%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Scurry County

ERCOT's interconnection queue (October 2026 report) lists 16 projects in Scurry County, 4,815 MW in all: 2,870 MW solar, 1,923 MW batteries, 22 MW wind. 1,414 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Jade Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Jade Solar

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.