All ERCOT wind and solar plants · Curtailment map and ranking

Jklp: curtailment and node price

A solar plant in Texas (Texas). It settles at resource node JKLP_SLR_RN in LZ_SOUTH.

0%of its potential output curtailed in the last 12 months (0.6 GWh). #334 of 494 ERCOT wind and solar plants by curtailed energy.
$30.13average real-time price at its node, per MWh, against $33.12 in its load zone, a $2.99 discount
−$19.13average node price while it was curtailed, weighted by the curtailed energy
3%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)37.60.92.5%$26.59$28.19$21.292%
20253080.90.3%$29.37$33.50$12.234%
2026 to date96.90.40.4%$28.49$31.93−$30.064%
Last 12 months1780.60.3%$30.13$33.12−$19.133%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

The full picture

A LoadSettle asset report on Jklp adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Jklp

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.