All ERCOT wind and solar plants · Curtailment map and ranking

Long Draw Solar: curtailment and node price

A 227 MW solar plant in Borden County, Texas (West), in service 2021. It settles at resource node LGDRAW_S_ALL in LZ_WEST. Owner (public sources): ENGIE North America.

18%of its potential output curtailed in the last 12 months (104 GWh). #34 of 494 ERCOT wind and solar plants by curtailed energy.
$32.04average real-time price at its node, per MWh, against $35.34 in its load zone, a $3.30 discount
−$7.56average node price while it was curtailed, weighted by the curtailed energy
14%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)55345.48.2%$26.34$35.71−$5.3413%
202557254.99.6%$30.30$42.18−$7.9014%
2026 to date44990.120.1%$29.55$32.33−$7.6316%
Last 12 months59110417.5%$32.04$35.34−$7.5614%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Borden County

ERCOT's interconnection queue (October 2026 report) lists 17 projects in Borden County, 5,557 MW in all: 4,152 MW solar, 1,392 MW batteries, 12 MW wind. 3,737 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Long Draw Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.