Longhorn Wind North: curtailment and node price
A 200 MW wind farm in Floyd County, Texas (Panhandle), in service 2015. It settles at resource node LHORN_N_U1_2 in LZ_WEST. Owner (public sources): Boralex (50%) with a BlackRock fund.
By year
| Period | Potential GWh | Curtailed GWh | Curtailed | Node $/MWh | Load zone $/MWh | Node while curtailed | Hours ≤ $0 |
|---|---|---|---|---|---|---|---|
| 2024 (from Jan 24) | 720 | 1.1 | 0.1% | $19.44 | $35.71 | −$32.45 | 23% |
| 2025 | 723 | 29.6 | 4.1% | $23.64 | $42.18 | −$15.99 | 22% |
| 2026 to date | 581 | 60.3 | 10.4% | $25.06 | $32.33 | −$12.76 | 20% |
| Last 12 months | 799 | 88.9 | 11.1% | $24.26 | $35.34 | −$13.66 | 22% |
Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.
The full picture
A LoadSettle asset report on Longhorn Wind North adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.
Request a report on Longhorn Wind North
The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.