All ERCOT wind and solar plants · Curtailment map and ranking

Magic Valley Wind (Redfish) 1B: curtailment and node price

A 104 MW wind farm in Willacy County, Texas (Coastal), in service 2012. It settles at resource node REDFISH_ALL in LZ_SOUTH.

10%of its potential output curtailed in the last 12 months (31.1 GWh). #101 of 494 ERCOT wind and solar plants by curtailed energy.
$26.59average real-time price at its node, per MWh, against $33.12 in its load zone, a $6.53 discount
−$8.90average node price while it was curtailed, weighted by the curtailed energy
9%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)25176.830.6%$23.32$30.43−$6.4814%
202529647.816.2%$26.15$33.50−$6.6912%
2026 to date24621.88.8%$25.90$31.93−$8.999%
Last 12 months30731.110.1%$26.59$33.12−$8.909%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Willacy County

ERCOT's interconnection queue (October 2026 report) lists 4 projects in Willacy County, 787 MW in all: 101 MW batteries, 686 MW wind. 501 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Magic Valley Wind (Redfish) 1B adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Magic Valley Wind (Redfish) 1B

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.