Magnet Wing U1 (Lane City Wind): curtailment and node price

A 98 MW wind farm in Matagorda County, Texas (Coastal), in service 2026. It settles at resource node MAG_RN in LZ_HOUSTON.

0%of its potential output curtailed in the last 12 months (1.1 GWh). #306 of 494 ERCOT wind and solar plants by curtailed energy.
$30.03average real-time price at its node, per MWh, against $33.15 in its load zone, a $3.12 discount
−$2.20average node price while it was curtailed, weighted by the curtailed energy
3%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
202573.81.21.6%$30.42$33.74$0.103%
2026 to date1970.00.0%$29.42$33.44−$64.554%
Last 12 months2671.10.4%$30.03$33.15−$2.203%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Matagorda County

ERCOT's interconnection queue (October 2026 report) lists 23 projects in Matagorda County, 5,513 MW in all: 2,210 MW solar, 1,725 MW batteries, 241 MW wind, 1,337 MW other. 1,701 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Magnet Wing U1 (Lane City Wind) adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Magnet Wing U1 (Lane City Wind)

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.