Mariah Del Norte 1: curtailment and node price

A 115 MW wind farm in Parmer County, Texas (Panhandle), in service 2017. It settles at resource node MARIAH_ALL in LZ_WEST.

0%of its potential output curtailed in the last 12 months (1.2 GWh). #305 of 494 ERCOT wind and solar plants by curtailed energy.
$23.98average real-time price at its node, per MWh, against $35.34 in its load zone, a $11.36 discount
−$40.75average node price while it was curtailed, weighted by the curtailed energy
23%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)4307.21.7%$19.05$35.71−$33.7124%
20254210.90.2%$23.36$42.18−$40.7023%
2026 to date3150.30.1%$24.86$32.33−$37.9621%
Last 12 months4401.20.3%$23.98$35.34−$40.7523%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

The full picture

A LoadSettle asset report on Mariah Del Norte 1 adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Mariah Del Norte 1

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.