A 150 MW wind farm in Dickens County, Texas (Panhandle), in service 2008. It settles at resource node MWEC_G1 in LZ_WEST. Owner (public sources): Invenergy.

28%of its potential output curtailed in the last 12 months (141 GWh). #16 of 494 ERCOT wind and solar plants by curtailed energy.
$29.07average real-time price at its node, per MWh, against $35.34 in its load zone, a $6.27 discount
−$3.83average node price while it was curtailed, weighted by the curtailed energy
13%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)47213729.0%$27.42$35.71−$3.9212%
202548610722.1%$30.86$42.18−$4.409%
2026 to date36911029.9%$28.45$32.33−$4.1115%
Last 12 months50514127.9%$29.07$35.34−$3.8313%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Dickens County

ERCOT's interconnection queue (October 2026 report) lists 9 projects in Dickens County, 2,317 MW in all: 1,102 MW solar, 922 MW batteries, 293 MW wind. 1,698 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Mcadoo Wind adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Mcadoo Wind

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.