Morrow Lake Solar: curtailment and node price
A 202 MW solar plant in Frio County, Texas (South), in service 2025. It settles at resource node MROW_SLR_RN in LZ_SOUTH.
By year
| Period | Potential GWh | Curtailed GWh | Curtailed | Node $/MWh | Load zone $/MWh | Node while curtailed | Hours ≤ $0 |
|---|---|---|---|---|---|---|---|
| 2024 (from Jan 24) | 186 | 2.7 | 1.5% | $28.77 | $29.63 | $1.91 | 2% |
| 2025 | 480 | 13.1 | 2.7% | $33.33 | $33.50 | −$3.19 | 8% |
| 2026 to date | 359 | 3.3 | 0.9% | $31.58 | $31.93 | −$10.85 | 6% |
| Last 12 months | 475 | 3.9 | 0.8% | $33.26 | $33.12 | −$10.17 | 5% |
Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.
What's coming in Frio County
ERCOT's interconnection queue (October 2026 report) lists 4 projects in Frio County, 804 MW in all: 402 MW solar, 402 MW batteries. None of it has a signed interconnection agreement yet. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.
The full picture
A LoadSettle asset report on Morrow Lake Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.