Norton Solar: curtailment and node price

A 126 MW solar plant in Runnels County, Texas (West), in service 2025. It settles at resource node NRTN_SLR_RN in LZ_WEST.

2%of its potential output curtailed in the last 12 months (7.2 GWh). #217 of 494 ERCOT wind and solar plants by curtailed energy.
$29.24average real-time price at its node, per MWh, against $35.34 in its load zone, a $6.10 discount
−$32.11average node price while it was curtailed, weighted by the curtailed energy
15%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
20251012.52.5%$33.04$42.93$0.545%
2026 to date2415.02.1%$27.80$32.33−$44.3317%
Last 12 months3157.22.3%$29.24$35.34−$32.1115%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Runnels County

ERCOT's interconnection queue (October 2026 report) lists 8 projects in Runnels County, 1,800 MW in all: 1,231 MW solar, 569 MW batteries. 226 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Norton Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Norton Solar

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.