A 151 MW wind farm in Floyd County, Texas (Panhandle), in service 2017. It settles at resource node COTPLNS_RN in LZ_WEST.

1%of its potential output curtailed in the last 12 months (3.8 GWh). #253 of 494 ERCOT wind and solar plants by curtailed energy.
$24.09average real-time price at its node, per MWh, against $35.34 in its load zone, a $11.25 discount
−$30.81average node price while it was curtailed, weighted by the curtailed energy
23%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)52017.03.3%$19.36$35.71−$31.0724%
20255488.11.5%$23.35$42.18−$30.8923%
2026 to date4302.20.5%$24.89$32.33−$31.1821%
Last 12 months5933.80.6%$24.09$35.34−$30.8123%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

The full picture

A LoadSettle asset report on Old Settler Wind adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.