All ERCOT wind and solar plants · Curtailment map and ranking

Oriana Solar: curtailment and node price

A 181 MW solar plant in Victoria County, Texas (South), in service 2026. It settles at resource node ORIANA_RN in LZ_SOUTH.

3%of its potential output curtailed in the last 12 months (13.8 GWh). #156 of 494 ERCOT wind and solar plants by curtailed energy.
$29.99average real-time price at its node, per MWh, against $33.12 in its load zone, a $3.13 discount
$10.72average node price while it was curtailed, weighted by the curtailed energy
3%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
20251404.33.1%$30.48$33.82$22.444%
2026 to date31410.83.4%$28.87$31.93$8.074%
Last 12 months42013.83.3%$29.99$33.12$10.723%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Victoria County

ERCOT's interconnection queue (October 2026 report) lists 17 projects in Victoria County, 5,383 MW in all: 649 MW solar, 1,551 MW batteries, 277 MW wind, 1,585 MW gas, 1,320 MW other. 1,093 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Oriana Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Oriana Solar

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.