All ERCOT wind and solar plants · Curtailment map and ranking

Oveja Wind: curtailment and node price

A 302 MW wind farm in Irion County, Texas (West), in service 2021. It settles at resource node HICK_G1_G2 in LZ_WEST.

0%of its potential output curtailed in the last 12 months (0.1 GWh). #431 of 494 ERCOT wind and solar plants by curtailed energy.
$31.28average real-time price at its node, per MWh, against $35.34 in its load zone, a $4.06 discount
−$13.97average node price while it was curtailed, weighted by the curtailed energy
13%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)11080.70.1%$29.45$35.71−$22.0912%
202512320.10.0%$34.03$42.18−$22.539%
2026 to date8930.00.0%$29.11$32.33−$16.2015%
Last 12 months12430.10.0%$31.28$35.34−$13.9713%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Irion County

ERCOT's interconnection queue (October 2026 report) lists 1 project in Irion County, 150 MW in all: 150 MW batteries. None of it has a signed interconnection agreement yet. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Oveja Wind adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Oveja Wind

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.