Oveja Wind: curtailment and node price
A 302 MW wind farm in Irion County, Texas (West), in service 2021. It settles at resource node HICK_G1_G2 in LZ_WEST.
By year
| Period | Potential GWh | Curtailed GWh | Curtailed | Node $/MWh | Load zone $/MWh | Node while curtailed | Hours ≤ $0 |
|---|---|---|---|---|---|---|---|
| 2024 (from Jan 24) | 1108 | 0.7 | 0.1% | $29.45 | $35.71 | −$22.09 | 12% |
| 2025 | 1232 | 0.1 | 0.0% | $34.03 | $42.18 | −$22.53 | 9% |
| 2026 to date | 893 | 0.0 | 0.0% | $29.11 | $32.33 | −$16.20 | 15% |
| Last 12 months | 1243 | 0.1 | 0.0% | $31.28 | $35.34 | −$13.97 | 13% |
Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.
What's coming in Irion County
ERCOT's interconnection queue (October 2026 report) lists 1 project in Irion County, 150 MW in all: 150 MW batteries. None of it has a signed interconnection agreement yet. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.
The full picture
A LoadSettle asset report on Oveja Wind adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.