Panhandle Wind 1: curtailment and node price

A 218 MW wind farm in Carson County, Texas (Panhandle), in service 2014. It settles at resource node PH1_UNIT1_2 in LZ_WEST. Owner (public sources): Pattern Energy.

17%of its potential output curtailed in the last 12 months (128 GWh). #21 of 494 ERCOT wind and solar plants by curtailed energy.
$24.38average real-time price at its node, per MWh, against $35.34 in its load zone, a $10.96 discount
−$9.24average node price while it was curtailed, weighted by the curtailed energy
22%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)66618127.2%$19.49$35.71−$13.8723%
202571116122.7%$23.81$42.18−$10.9822%
2026 to date55083.015.1%$25.14$32.33−$8.6620%
Last 12 months75312817.0%$24.38$35.34−$9.2422%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Carson County

ERCOT's interconnection queue (October 2026 report) lists 4 projects in Carson County, 1,618 MW in all: 439 MW solar, 572 MW batteries, 606 MW wind. 1,417 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Panhandle Wind 1 adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Panhandle Wind 1

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.