All ERCOT wind and solar plants · Curtailment map and ranking

Penascal Wind 2: curtailment and node price

A 425 MW wind farm in Kenedy County, Texas (Coastal), in service 2009. It settles at resource node PENA_ALL in LZ_SOUTH. Owner (public sources): Avangrid.

29%of its potential output curtailed in the last 12 months (106 GWh). #32 of 494 ERCOT wind and solar plants by curtailed energy.
$23.95average real-time price at its node, per MWh, against $33.12 in its load zone, a $9.17 discount
−$5.68average node price while it was curtailed, weighted by the curtailed energy
20%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)29386.429.5%$22.90$30.43−$8.2917%
202534515645.2%$22.12$33.50−$7.1022%
2026 to date29486.129.3%$21.88$31.93−$5.8123%
Last 12 months36610628.8%$23.95$33.12−$5.6820%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Kenedy County

ERCOT's interconnection queue (October 2026 report) lists 4 projects in Kenedy County, 1,311 MW in all: 609 MW solar, 178 MW batteries, 523 MW wind. 252 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Penascal Wind 2 adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Penascal Wind 2

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.