All ERCOT wind and solar plants · Curtailment map and ranking

Porter Solar: curtailment and node price

A 246 MW solar plant in Denton County, Texas (North), in service 2025. It settles at resource node PORTSL_UNIT1 in LZ_NORTH.

12%of its potential output curtailed in the last 12 months (67.3 GWh). #61 of 494 ERCOT wind and solar plants by curtailed energy.
$28.76average real-time price at its node, per MWh, against $33.64 in its load zone, a $4.88 discount
−$6.60average node price while it was curtailed, weighted by the curtailed energy
13%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)35734.19.6%$24.26$26.41−$1.089%
202556232.75.8%$28.26$32.66−$8.2211%
2026 to date42755.413.0%$29.88$33.93−$5.3511%
Last 12 months55967.312.0%$28.76$33.64−$6.6013%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Denton County

ERCOT's interconnection queue (October 2026 report) lists 1 project in Denton County, 201 MW in all: 201 MW batteries. None of it has a signed interconnection agreement yet. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Porter Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Porter Solar

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.