Rock Springs Val Verde Wind (Fermi) 1: curtailment and node price

A 122 MW wind farm in Val Verde County, Texas (West), in service 2017. It settles at resource node FERMI_ALL in LZ_SOUTH.

3%of its potential output curtailed in the last 12 months (12.2 GWh). #169 of 494 ERCOT wind and solar plants by curtailed energy.
$35.42average real-time price at its node, per MWh, against $33.12 in its load zone, a $2.30 premium
−$16.94average node price while it was curtailed, weighted by the curtailed energy
14%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)38236.39.5%$35.09$30.43−$8.7512%
202540914.33.5%$46.31$33.50−$16.1411%
2026 to date2926.02.1%$33.00$31.93−$20.5514%
Last 12 months40012.23.0%$35.42$33.12−$16.9414%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Val Verde County

ERCOT's interconnection queue (October 2026 report) lists 3 projects in Val Verde County, 475 MW in all: 372 MW solar, 103 MW batteries. None of it has a signed interconnection agreement yet. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Rock Springs Val Verde Wind (Fermi) 1 adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Rock Springs Val Verde Wind (Fermi) 1

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.