All ERCOT wind and solar plants · Curtailment map and ranking

Roseland Solar: curtailment and node price

A 508 MW solar plant in Falls County, Texas (North), in service 2025. It settles at resource node ROSELAND_ALL in LZ_NORTH.

5%of its potential output curtailed in the last 12 months (59.4 GWh). #71 of 494 ERCOT wind and solar plants by curtailed energy.
$31.04average real-time price at its node, per MWh, against $33.64 in its load zone, a $2.60 discount
−$0.35average node price while it was curtailed, weighted by the curtailed energy
5%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)98673.77.5%$24.80$26.41−$3.703%
2025111168.86.2%$30.90$32.66−$4.545%
2026 to date88548.85.5%$30.81$33.93$0.216%
Last 12 months116259.45.1%$31.04$33.64−$0.355%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Falls County

ERCOT's interconnection queue (October 2026 report) lists 7 projects in Falls County, 612 MW in all: 552 MW solar, 60 MW batteries. None of it has a signed interconnection agreement yet. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Roseland Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Roseland Solar

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.