All ERCOT wind and solar plants · Curtailment map and ranking

Salt Fork 1 Wind: curtailment and node price

A 174 MW wind farm in Donley County, Texas (Panhandle), in service 2017. It settles at resource node SLTFRK_UN1_2 in LZ_WEST.

0%of its potential output curtailed in the last 12 months (0.4 GWh). #359 of 494 ERCOT wind and solar plants by curtailed energy.
$24.46average real-time price at its node, per MWh, against $35.34 in its load zone, a $10.88 discount
$8.58average node price while it was curtailed, weighted by the curtailed energy
21%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)6610.00.0%$19.58$35.71$9.9323%
20256890.90.1%$23.90$42.18$6.7921%
2026 to date5170.00.0%$25.20$32.33−$4.6920%
Last 12 months7110.40.1%$24.46$35.34$8.5821%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

The full picture

A LoadSettle asset report on Salt Fork 1 Wind adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Salt Fork 1 Wind

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.