All ERCOT wind and solar plants · Curtailment map and ranking

Seymour Hills Wind (S_Hills Wind): curtailment and node price

A 30 MW wind farm in Baylor County, Texas (West), in service 2019. It settles at resource node S_HILLS_RN in LZ_WEST.

0%of its potential output curtailed in the last 12 months (0.4 GWh). #356 of 494 ERCOT wind and solar plants by curtailed energy.
$27.71average real-time price at its node, per MWh, against $35.34 in its load zone, a $7.63 discount
−$47.52average node price while it was curtailed, weighted by the curtailed energy
13%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)1220.00.0%$24.66$35.71−$21.678%
20251330.20.2%$28.82$42.18−$26.1410%
2026 to date1010.40.4%$27.49$32.33−$55.4912%
Last 12 months1390.40.3%$27.71$35.34−$47.5213%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Baylor County

ERCOT's interconnection queue (October 2026 report) lists 6 projects in Baylor County, 1,891 MW in all: 1,106 MW solar, 785 MW wind. 785 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Seymour Hills Wind (S_Hills Wind) adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Seymour Hills Wind (S_Hills Wind)

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.