All ERCOT wind and solar plants · Curtailment map and ranking

Silver Star Wind: curtailment and node price

A 53 MW wind farm in Erath County, Texas (North), in service 2008. It settles at resource node FLTCK_SSI in LZ_NORTH.

0%of its potential output curtailed in the last 12 months (0.1 GWh). #417 of 494 ERCOT wind and solar plants by curtailed energy.
$32.48average real-time price at its node, per MWh, against $33.64 in its load zone, a $1.16 discount
$12.16average node price while it was curtailed, weighted by the curtailed energy
5%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)1840.20.1%$26.67$26.41−$33.195%
20252050.10.0%$32.94$32.66$11.103%
2026 to date1600.00.0%$32.81$33.93$9.365%
Last 12 months2220.10.0%$32.48$33.64$12.165%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Erath County

ERCOT's interconnection queue (October 2026 report) lists 3 projects in Erath County, 665 MW in all: 207 MW solar, 457 MW batteries. 514 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Silver Star Wind adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Silver Star Wind

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.