Spinning Spur Wind Two B: curtailment and node price

A 98 MW wind farm in Oldham County, Texas (Panhandle), in service 2015. It settles at resource node SSPURT_WIND1 in LZ_WEST. Owner (public sources): EDF power solutions.

30%of its potential output curtailed in the last 12 months (124 GWh). #22 of 494 ERCOT wind and solar plants by curtailed energy.
$24.18average real-time price at its node, per MWh, against $35.34 in its load zone, a $11.16 discount
−$4.92average node price while it was curtailed, weighted by the curtailed energy
22%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)3900.10.0%$19.25$35.71−$35.4124%
202538444.611.6%$23.58$42.18−$5.0622%
2026 to date29779.126.6%$24.97$32.33−$4.8521%
Last 12 months40712430.4%$24.18$35.34−$4.9222%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

The full picture

A LoadSettle asset report on Spinning Spur Wind Two B adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Spinning Spur Wind Two B

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.