Spinning Spur Wind Two B: curtailment and node price
A 98 MW wind farm in Oldham County, Texas (Panhandle), in service 2015. It settles at resource node SSPURT_WIND1 in LZ_WEST. Owner (public sources): EDF power solutions.
By year
| Period | Potential GWh | Curtailed GWh | Curtailed | Node $/MWh | Load zone $/MWh | Node while curtailed | Hours ≤ $0 |
|---|---|---|---|---|---|---|---|
| 2024 (from Jan 24) | 390 | 0.1 | 0.0% | $19.25 | $35.71 | −$35.41 | 24% |
| 2025 | 384 | 44.6 | 11.6% | $23.58 | $42.18 | −$5.06 | 22% |
| 2026 to date | 297 | 79.1 | 26.6% | $24.97 | $32.33 | −$4.85 | 21% |
| Last 12 months | 407 | 124 | 30.4% | $24.18 | $35.34 | −$4.92 | 22% |
Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.
The full picture
A LoadSettle asset report on Spinning Spur Wind Two B adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.
Request a report on Spinning Spur Wind Two B
The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.