All ERCOT wind and solar plants · Curtailment map and ranking

Tahoka Wind 1: curtailment and node price

A 150 MW wind farm in Lynn County, Texas (West), in service 2019. It settles at resource node TAHOKA_ALL in LZ_WEST.

0%of its potential output curtailed in the last 12 months (3.0 GWh). #263 of 494 ERCOT wind and solar plants by curtailed energy.
$30.54average real-time price at its node, per MWh, against $35.34 in its load zone, a $4.80 discount
−$75.78average node price while it was curtailed, weighted by the curtailed energy
16%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)5280.10.0%$27.67$35.71−$24.6113%
20255743.60.6%$28.74$42.18−$69.0216%
2026 to date4380.00.0%$30.32$32.33$2.6616%
Last 12 months6063.00.5%$30.54$35.34−$75.7816%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

The full picture

A LoadSettle asset report on Tahoka Wind 1 adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Tahoka Wind 1

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.