All ERCOT wind and solar plants · Curtailment map and ranking

Tavener U2 (Fort Bend Solar): curtailment and node price

A 100 MW solar plant in Fort Bend County, Texas (Houston), in service 2023. It settles at resource node TAV_RN in LZ_HOUSTON.

0%of its potential output curtailed in the last 12 months (0.9 GWh). #316 of 494 ERCOT wind and solar plants by curtailed energy.
$31.71average real-time price at its node, per MWh, against $33.15 in its load zone, a $1.44 discount
−$29.32average node price while it was curtailed, weighted by the curtailed energy
3%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)1470.70.4%$26.30$27.20−$22.963%
20252110.80.4%$32.32$33.19−$32.253%
2026 to date1670.60.4%$31.42$33.44−$26.893%
Last 12 months2220.90.4%$31.71$33.15−$29.323%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Fort Bend County

ERCOT's interconnection queue (October 2026 report) lists 10 projects in Fort Bend County, 1,936 MW in all: 1,936 MW batteries. 1,049 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Tavener U2 (Fort Bend Solar) adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Tavener U2 (Fort Bend Solar)

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.