All ERCOT wind and solar plants · Curtailment map and ranking

Vancourt Solar: curtailment and node price

A 46 MW solar plant in Cameron County, Texas (Coastal), in service 2023. It settles at resource node VANCOURT_RN in LZ_SOUTH.

2%of its potential output curtailed in the last 12 months (2.0 GWh). #279 of 494 ERCOT wind and solar plants by curtailed energy.
$26.45average real-time price at its node, per MWh, against $33.12 in its load zone, a $6.67 discount
−$28.59average node price while it was curtailed, weighted by the curtailed energy
9%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)90.55.35.9%$26.39$30.43−$24.9115%
202510711.711.0%$32.31$33.50−$23.1716%
2026 to date82.41.92.2%$25.18$31.93−$28.9310%
Last 12 months1102.01.8%$26.45$33.12−$28.599%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Cameron County

ERCOT's interconnection queue (October 2026 report) lists 28 projects in Cameron County, 8,537 MW in all: 908 MW solar, 2,741 MW batteries, 300 MW wind, 4,508 MW gas, 80 MW other. 746 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Vancourt Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Vancourt Solar

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.