All ERCOT wind and solar plants · Curtailment map and ranking

West Of Pecos Solar: curtailment and node price

A 100 MW solar plant in Reeves County, Texas (West), in service 2019. It settles at resource node W_PECO_UNIT1 in LZ_WEST.

9%of its potential output curtailed in the last 12 months (20.1 GWh). #132 of 494 ERCOT wind and solar plants by curtailed energy.
$37.41average real-time price at its node, per MWh, against $35.34 in its load zone, a $2.07 premium
−$4.22average node price while it was curtailed, weighted by the curtailed energy
10%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)25334.813.7%$39.77$35.71−$1.238%
202525510.03.9%$47.24$42.18−$2.835%
2026 to date17218.210.6%$33.37$32.33−$4.3313%
Last 12 months22920.18.8%$37.41$35.34−$4.2210%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Reeves County

ERCOT's interconnection queue (October 2026 report) lists 24 projects in Reeves County, 8,350 MW in all: 1,644 MW solar, 951 MW batteries, 1,031 MW wind, 4,572 MW gas, 152 MW other. 1,750 MW of it has signed interconnection agreements, the part most likely to be built. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on West Of Pecos Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on West Of Pecos Solar

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.