Whirlwind Energy: curtailment and node price

A 60 MW wind farm in Floyd County, Texas (Panhandle), in service 2007. It settles at resource node WEC_WECG1 in LZ_WEST.

21%of its potential output curtailed in the last 12 months (22.1 GWh). #127 of 494 ERCOT wind and solar plants by curtailed energy.
$29.83average real-time price at its node, per MWh, against $35.34 in its load zone, a $5.51 discount
−$5.24average node price while it was curtailed, weighted by the curtailed energy
13%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)10512.211.6%$24.73$35.71−$3.3611%
202510515.915.1%$34.10$42.18−$3.778%
2026 to date75.417.022.6%$29.31$32.33−$5.4214%
Last 12 months10622.120.8%$29.83$35.34−$5.2413%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

The full picture

A LoadSettle asset report on Whirlwind Energy adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.