All ERCOT wind and solar plants · Curtailment map and ranking

Zier Solar: curtailment and node price

A 161 MW solar plant in Kinney County, Texas (South), in service 2024. It settles at resource node ZIER_SLR_ALL in LZ_SOUTH.

4%of its potential output curtailed in the last 12 months (14.8 GWh). #151 of 494 ERCOT wind and solar plants by curtailed energy.
$37.02average real-time price at its node, per MWh, against $33.12 in its load zone, a $3.90 premium
−$6.60average node price while it was curtailed, weighted by the curtailed energy
6%of hours with the node priced at or below $0

By year

PeriodPotential GWhCurtailed GWhCurtailedNode $/MWhLoad zone $/MWhNode while curtailedHours ≤ $0
2024 (from Jan 24)36432.79.0%$34.48$30.43−$2.176%
202538515.84.1%$43.61$33.50−$4.306%
2026 to date27813.64.9%$34.83$31.93−$7.107%
Last 12 months36914.84.0%$37.02$33.12−$6.606%

Curtailed = available capacity above ERCOT's dispatch target in every 5-minute run, so it includes economic backdown as well as congestion. Potential = available capacity. Prices are ERCOT real-time settlement point prices. Data 2024-01-24 to 2026-09-17; ERCOT publishes dispatch data 60 days after the fact. Last 12 months = 2025-09-18 to 2026-09-17.

What's coming in Kinney County

ERCOT's interconnection queue (October 2026 report) lists 9 projects in Kinney County, 945 MW in all: 743 MW solar, 202 MW batteries. None of it has a signed interconnection agreement yet. New plants near the same substations can raise curtailment and widen the discount at the node. The whole queue.

The full picture

A LoadSettle asset report on Zier Solar adds what the curtailment and prices mean for revenue: capture price and basis to the hubs, a revenue bridge, day-ahead vs real-time, which transmission limits move this node and by how much, and what ERCOT's congestion auctions price for the next two years. See a sample report.

Request a report on Zier Solar

The first five reports are free for lenders, buyers and developers, in exchange for 15 minutes of feedback.